The Challenge
After a season of heavy snow and high winds, Savya Shukla reached out to Mountain Vista Roofing to evaluate suspected roof damage. They had noticed new leaks forming and visible signs of wear that raised concerns about the roof’s structural integrity.
Upon our inspection, it became clear that standard roof repairs wouldn’t be enough. Repairs may have been a short-term fix, but this home needed a complete roof replacement to address the current storm damage and provide long-term protection.
The Strategy - Creative Process
Every roofing project at Mountain Vista Roof Systems begins with a thorough, in-person roof inspection.
For this home, we began the inspection process by looking for several key issues:
- Compromised shingles
- Soft decking
- Signs of water infiltration
Next, we reviewed the existing ventilation system to determine whether it met current building codes.
Following the inspection, we provided a detailed roof replacement quote outlining multiple asphalt shingle options for the replacement - so the homeowner could choose the best fit for their style and budget.
We also included recommended upgrading their gutter system to improve both function and home value.
Once the homeowner finalized their selections, we began the permitting process and scheduled a convenient start date. Our trained crews are committed to efficient, high-quality roof installations with minimal disruption to daily life.
The Timeline
Efficiency and communication are central to our roof replacement process. The timeline for this project:
Week 1:
- The homeowner reached out
- We conducted our inspection
- We delivered the project quote with material selections
Week 2:
- The project quote was signed
- We ordered the materials
- We got approvals and permits
- We started the project
Week 3:
- We executed the entire roof installation
- Our team performed an exhaustive inspection for quality assurance
- We cleaned up the jobsite and completed the project
After the quote was signed, we had the roof installed, inspected, and approved by the local housing authority within just three weeks of the project kickoff.
The Challenge
Our team completely removed the damaged roofing system and replaced the compromised plywood beneath the surface. We installed a brand-new asphalt shingle roof, customized to the homeowner’s color and material preferences.
The Final Result:
The homeowner now has a durable, energy-efficient roof designed to perform in all weather conditions and enhance the home’s overall value. With proper maintenance and upkeep, the roof should last at least 20-30 years.